← ExperienceIT Support
Seif Eldien Ahmad Mohammad

0xdaphantom

Seif Eldien Ahmad Mohammad

Cybersecurity · IT Support · Development

Current role / Arslan Tech

IT Experience — Field Notes & Technical Work

My current IT support role at Arslan Tech is one part of a broader professional journey. These field notes document hands-on support, infrastructure deployment, troubleshooting, and client-site installations completed as part of the technical team.

Arslan TechTechnical team

Work log

Field Notes

Practical work · Team-based delivery

Note 01 / 07

Windows Support & Workstation Deployment

Workstation setup tasks included Windows installations, initial configuration, and follow-up support at deployment.

  • Windows Support
  • Workstation Deployment
  • Troubleshooting

Work performed

  • Installed Windows on desktop workstations and used Windows Update Assistant for system updates and drivers.
  • Connected a PC case and monitor before installing Windows as part of workstation setup.
  • Investigated a problematic Office 2021 installation and removed the installed files.
  • Changed a local Windows account password using Ctrl + Alt + Delete.
  • Continued workstation setup after a hardware issue had been identified and resolved by a colleague.

Scope / outcome: Workstation setup continued after the hardware issue was resolved by a colleague.

Note 02 / 07

Printer Installation & Troubleshooting

Printer work covered client workstations and cashier stations in a restaurant environment.

  • Printer Support
  • Kyocera
  • Client Support

Work performed

  • Installed Kyocera printer drivers on client workstations and installed and configured a Kyocera printer over USB.
  • Explained printer operation and basic troubleshooting procedures to a client.
  • Installed printers and related equipment for restaurant cashier stations, then performed a basic network connectivity check.
  • Investigated faint or weak print output and worked on restoring print quality.

Scope / outcome: Clients received guidance on printer operation and basic troubleshooting. The faint-output issue was investigated; no resolution is claimed here.

Note 03 / 07

CCTV & IP Camera Configuration

Camera tasks involved IP camera setup, site review, and installation support across construction and restaurant environments.

  • CCTV
  • IP Cameras
  • Site Survey
  • Installation

Work performed

  • Configured 10 Tiandy IP cameras by assigning IP addresses and setting administrator accounts.
  • Compared technical drawings with the construction site layout to review proposed camera positions.
  • Assisted with cable routing and participated in completing CCTV camera installation at the construction site.
  • Installed two analog CCTV cameras in a restaurant storage facility.
  • Gained practical exposure to both analog and IP CCTV systems.

Scope / outcome: The 10 Tiandy cameras were assigned IP addresses and administrator accounts. NVR integration was handled by a senior colleague.

Note 04 / 07

Networking & Physical Infrastructure

Hands-on network work focused on physical connections, cable termination, rack tasks, and basic connectivity checks.

  • Networking
  • Infrastructure
  • RJ45
  • Troubleshooting

Work performed

  • Practiced RJ45 Ethernet cable termination and crimping.
  • Traced a non-working network point to a disconnected connection inside the rack and reconnected it.
  • Participated in physical network infrastructure installation, including rack setup and patching.
  • Performed basic network connectivity checks during client-site installations.
  • Assisted with cable routing and physical infrastructure work during CCTV installations.

Scope / outcome: The disconnected rack connection was reconnected. Work described here did not involve advanced switching, VLANs, routing, or network design.

Note 05 / 07

Server Rack & VoIP Infrastructure

A VoIP server was relocated to a new location in a call-center environment.

  • VoIP
  • Server Rack
  • Infrastructure

Work performed

  • Assisted with moving the VoIP server and mounting it in a rack.
  • Helped test physical connectivity and connection points after the relocation.
  • Participated in rack organization and physical infrastructure installation.
  • Gained introductory exposure to VoIP systems used in the call center.

Scope / outcome: Physical connectivity and connection points were tested after relocation. I assisted with the move; I did not configure the VoIP server.

Note 06 / 07

Biometric Attendance & HR Systems

Investigated a fingerprint attendance device that was not appearing in the HR system.

  • Troubleshooting
  • Biometrics
  • Physical Connectivity

Work performed

  • Tested the fingerprint attendance device and checked its connection.
  • Identified that the connection required re-termination/re-crimping.

Scope / outcome: The investigation pointed to a physical connection requiring re-termination. No HR software or backend changes are claimed.

Note 07 / 07

Client-Site Infrastructure Projects

Participated in field work across new-company installations, restaurants, construction sites, storage facilities, and workstation deployments.

  • Client-Site Work
  • Infrastructure
  • CCTV
  • Networking

Work performed

  • Supported a new-company infrastructure project involving CCTV, networking, and sound-system installations.
  • Assisted the team with rack setup, patching, and physical infrastructure deployment.
  • Set up equipment for restaurant cashier stations, including printers and basic network checks.
  • Worked across client environments including construction sites, restaurants, storage facilities, and workstation deployments.

Scope / outcome: The work log reflects participation in team installation tasks. It does not attribute sound-system programming or configuration to my role.

Training & certifications

IT Credentials

Relevant training and certifications supporting my ongoing work and development in IT.